Case Study – 1 JP Nagar
Before | After |
---|---|
Date: 29th November 2019 Time: 08:00 PM Location: JP Nagar |
Date: 9th January 2020 Time: 03:30 PM Location: JP Nagar |










Observations
-
Observed a tower south east side at the distance around 100m of the house audited.
-
Observed Wi-Fi router in Living Hall(1).
-
The CTR Reading is observed to be High in Living Hall(1),TV Room (4) ,Guest Room(5),Guest Room-1(6) ,Master Bed Room(7) And Kids Room(8) of the house audited.
-
The CTR Reading is observed to be Moderately high in Kitchen (2) of the house audited.
-
The CTR Reading is observed to be Safe in Dining Hall(3) of the house audited.
Recommendations
- Window area of the Living Hall(1),TV Room (4) ,Guest Room(5),Guest Room-1(6) ,Master Bed Room(7) And Kids Room(8) must be Secured with LiveSafe Mesh .
- Wall area of the Living Hall(1),TV Room (4) ,Guest Room(5),Guest Room-1(6) ,Master Bed Room(7) And Kids Room(8) must be secured with LiveSafe Mesh and Coating.
97.45% EM Radiation reduction achieved of post LiveSAFE Installation.
We achieved 90% Reduce EM Radiation after LiveSAFE Installation.
Case Studies & Readings
SAR value – How important and true is it?
SAR value –
THE FUTURE OF TRANSPORTATION AND COMMUNICATION
THE FUTURE OF
Plants, Wireless Radiation and YOU
Plants, Wireless Radiation