Case Study – 3 Tin Factory

Before After

Date: 1st December 2017

Time: 08:00 PM

Location: Tin Factory.

Date: 22nd August 2018

Time: 11:50 AM

Location: Tin Factory.

Observations

  • Observed three towers with multiple 2G,3G and 4G antennas, one at a distance of less than 100m and other two at a distance of 300m from the house audited.

  • CTR Reading is observed to be High in Master Bed Room(3) and Kids Room(4).

  • The CTR Reading is observed to be moderately high in Living Hall (1) and Kitchen (2) .

Recommendations

  • Windows area of the Master Bed Room(3) and Kids Room(4) needs be secured with LiveSAFE Mesh and LiveSAFE Film.

  • Wall area of the Master Bed Room(3) and Kids Room(4) needs be secured with LiveSAFE Mesh and LiveSAFE Coating. Ceiling area of the Master Bed Room(3) and Kids Room(4) needs be secured with LiveSAFE Coating

98.29% EM Radiation reduction achieved of post LiveSAFE Installation

We achieved 90% Reduce EM Radiation after LiveSAFE Installation.

Case Studies & Readings

How can we help you?

Thank you for your message. It has been sent.
There was an error trying to send your message. Please try again later.
2021-07-21T12:10:21+00:00
Go to Top