Case Study – 3 Tin Factory
Before | After |
---|---|
Date: 1st December 2017 Time: 08:00 PM Location: Tin Factory. |
Date: 22nd August 2018 Time: 11:50 AM Location: Tin Factory. |





Observations
-
Observed three towers with multiple 2G,3G and 4G antennas, one at a distance of less than 100m and other two at a distance of 300m from the house audited.
-
CTR Reading is observed to be High in Master Bed Room(3) and Kids Room(4).
-
The CTR Reading is observed to be moderately high in Living Hall (1) and Kitchen (2) .
Recommendations
-
Windows area of the Master Bed Room(3) and Kids Room(4) needs be secured with LiveSAFE Mesh and LiveSAFE Film.
-
Wall area of the Master Bed Room(3) and Kids Room(4) needs be secured with LiveSAFE Mesh and LiveSAFE Coating. Ceiling area of the Master Bed Room(3) and Kids Room(4) needs be secured with LiveSAFE Coating
98.29% EM Radiation reduction achieved of post LiveSAFE Installation
We achieved 90% Reduce EM Radiation after LiveSAFE Installation.
Case Studies & Readings
SAR value – How important and true is it?
SAR value –
THE FUTURE OF TRANSPORTATION AND COMMUNICATION
THE FUTURE OF
Plants, Wireless Radiation and YOU
Plants, Wireless Radiation